Route 9

Main Street from just south of Wyman Way to the Tuttle Road intersection will be paved and portion will be reconstructed this summer. In addition to the pavement overlay, a low pressure sewer system, shoulder widening and drainage improvements will be completed. A sidewalk will connect Wyman Way to the existing sidewalk on Main St, completing a near 2 mile sidewalk loop. Expect construction to begin in late August and last through the Fall.