Longmeadow/Ole Musket Road

Longmeadow/ Ole Musket Road 
Drainage Improvements

 

  • Update 8/8/23:  Driveway aprons that need to be grinded on Longmeadow Road and Ole Musket Road, will be done on Thursday, August 10th. We anticipate that this will not cause much of a disturbance to the residents.
  • Update 5/23/23: Paving will start on Longmeadow Road on 5/24/23, first thing in the morning.
  • Update 4/26/23: Construction workers will be installing curb on Longmeadow starting Thursday morning. Installation should be completed by Friday afternoon.
  • Update 4/13/23: It is confirmed that A.H.Grover will be starting in the cul-de-sac area of Longmeadow on Monday, April 17th.
  • Update 4/11/23: The drainage install phase of the Ole Musket construction project will be completed today.The contractor will be preparing the drainage pipe trenches for paving on Thursday and Friday. The trenches are scheduled to be paved in on Monday, weather permitting.
  • Update 4/4/23:  Construction started on Ole Musket Road Monday the 3rd of April.  The contractor is hoping to have the pipe and structures installed and completed by Thursday April 13th. Paving, curb and restoration to follow based on the timing of the opening of the paving plants.
  • Update 3/27/23: The Ole Musket Road and Longmeadow Road Drainage and Repaving project is set to begin on the week of April 3rd.  Crews from AH Grover will be starting first on Ole Musket Road, at the cul-de-sac, and working their way up the hill.  Work is expected to last approximately 6 weeks and then they will move to Longmeadow Road.
  • Field Reports
  • Longmeadow/ Ole Musket Plan Set 6.13.22
  • Bid Package 6.13.22 
  • Longmeadow/ Ole Musket Addendum
  • Bid Summary 7.14.22
  • Award Recommendation 7.14.22
  • A.H. Grover Bid Form